I. Purpose & Scope
To safely and effectively provide instruction on the inspection and proper use of powder puffs.
II. Definitions
Standard PPE – High Viz Garment, Hard Hat, Z-87.1 Safety Glasses, Gloves, Pants, Work Boots
III. Process
NOTE: Work instruction does not supplement the manual. For specific instructions for the exact model please refer to the owner’s manual.
A. Potential Hazards
- Slips, Trips, Falls Hazards
- Hazardous Atmosphere
- Flame and/or Explosive Hazard
- Electric Shock Hazard
- Flying Objects Hazards
- Hearing Hazards
- Crushing Hazard
- Impact Hazard
- Cut Hazard
- Burn Hazard
- Vibration Hazard
- Repetitive Motion Hazard
B. PPE
- Standard PPE
- Hearing Protection
- Metatarsal Protection
- Respiratory Protection – Recommended
C. Inspection
- Check for worn cracked or distorted retainer parts
- Ensure that all information on the tool is legible.
- Check the tamping butt lock screw and secure it tightly as needed.
- Check to see that the piston has sufficient drag and adjust packing nut accordingly.
D. Use
- For your safety and that of others, keep tool
against work at all times! - When moving from one work area to another, shut off tool.
E. Maintenance
Hourly
- After one hour of operation release the Throttle lever to stop the tool; push the Lubricator Valve inward and hold it in for about ten seconds. Release the valve and depress the throttle lever to resume work.
- Rapidly pushing the lubricator valve in and out will not introduce a significant amount of lubricant to the tool.
Daily
- At the beginning of each work shift, remove the oil chamber plug and fill the oil chamber with the recommended oil.
- Clean parts using proper cleaning solvents in well ventilated areas.
- Drain condensate from valve(s) at low point(s) of piping, air filter and compressor tank.
- Replenish supply of grease in the grease chamber. Four to six stroke from the grease gun injected through the grease fitting is sufficient.
(Performed by Authorized Personnel Only)
Manufacturer: American Pneumatic Tools
Model: M131
| Potential Energy Hazards | Method of Neutralizing Energy | Permits Required |
|---|---|---|
Lockout (Shut-Down Procedure)
- Notify all affected personnel.
- Turn off air source.
- Disconnect the air supply.
- Lockout the connection fitting.
Start-Up Procedure
- Notify all affected personnel that equipment is operational and removal of lockout will occur.
- Remove all tools, equipment and debris from the area.
- Remove lockout from the connection fitting.
- Attach to air supply, turn on air source and test equipment.
